MDPE Site Information Questionnaire
|
Home
|
Clients
|
FAQs
|
Request Proposal
|
Contact Us
|
Client Name:
Client Project Manager(PM):
PM's Phone:
Type of Facility:
Gas Station
LPST No:
Pipeline
Facility Id:
Other
Description:
Facility address:
Objectives for Mobile Dual-Phase Extraction (MDPE):
Remove Phase Separated Hydrocarbons?
Remediate soil contamination?
Reduce dissolved phase concentrations?
Select the type of contaminants:
Gasoline
Diesel
Others
MDPE Extraction point well number:
Approximate Static Water Table Depth:
ft.
Approximate PSH Thickness:
ft.
Well construction diameter:
inches
Total well depth(s):
ft.
Is potable water available on site?
Yes
No
Special well cap or vault keys req?
Yes
No
Flush Mount Wells?
Yes
No
provide detail on restrictions for performing MDPE:
Is the Site Active?
Yes
No
What will be the duration of MDPE ?
8 hrs
12 hrs
16 hrs
24 hrs
72 hrs
Provide the waste disposal facility location:
Name:
Organization:
Would you like us to remove liquids from onsite drums?
Yes
No
Do drums contain purge water/PSH?
Yes
No
What type of contaminants are stored in drums?
Gasoline
Diesel
Others
Your Comments:(Please email an updated SiteMap and directions at
brianburgess@envac.com
)
<>
Toll free Phone: 866 44 ENVAC
Fax: 512 533 0099
|
Home
|
Clients
|
FAQs
|
Request Proposal
|
Contact Us
|
© 2004 EnVac Environmental Services, LLC